Master Six Sigma Basics with 215 free flashcards. Study using spaced repetition and focus mode for effective learning in Business.
Sample card
What does DMAIC stand for in Six Sigma?
Define, Measure, Analyze, Improve, Control. It is the data-driven improvement cycle used for projects aimed at improving existing processes.
Q · 1 of 215
What does DMAIC stand for in Six Sigma?
Q · 2 of 215
Which Six Sigma belt level is responsible for leading project teams?
Q · 3 of 215
What is the purpose of a Fishbone diagram in the Analyze phase?
Define, Measure, Analyze, Improve, Control. It is the data-driven improvement cycle used for projects aimed at improving existing processes.
Green Belts. They lead smaller improvement projects while working part-time on Six Sigma, typically under the guidance of a Black Belt.
Also called an Ishikawa or cause-and-effect diagram, it helps teams brainstorm and categorize potential root causes of a problem, often grouped into the 6 Ms: Man, Machine, Material, Method, Measurement, and Mother Nature.
A p-chart monitors the proportion of defective items in subgroups of varying size, tracking attribute (pass/fail) data over time.
Cp = (USL - LSL) / (6 * standard deviation). It measures the potential capability of a process by comparing specification width to process spread, ignoring centering.
Cpk accounts for process centering. It is the minimum of (USL - mean)/(3σ) and (mean - LSL)/(3σ). Cp assumes perfect centering; Cpk reflects actual performance.
Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, and Extra processing (often remembered as DOWNTIME).
VOC is the process of capturing customers' expectations, preferences, and requirements for a product or service, typically through surveys, interviews, focus groups, and complaint data.
A Type I error occurs when the null hypothesis is rejected even though it is true. Its probability equals the significance level, alpha (α).
3.4 defects per million opportunities (DPMO), corresponding to a process operating at ±6 standard deviations between the specification limits.
An X-bar chart plots the subgroup (sample) means over time to monitor the central tendency of a process, with center line and upper/lower control limits calculated from the subgroup averages.
Common cause variation is inherent to the process and predictable; special cause variation comes from external sources and creates unpredictable signals. Control charts help distinguish the two.
Flashcards
Flip to reveal
Focus Mode
Spaced repetition
Multiple Choice
Test your knowledge
Type Answer
Active recall
Learn Mode
Multi-round mastery
Match Game
Memory challenge